For the Lötschberg base tunnel, ENOTRAC was entrusted with a wide range of engineering tasks covering the specification and rating of the 16.7 Hz traction power supply system, as well as that of the 50 Hz supply system. The list of tasks includes:
- Load calculations
- Electrical rating of overhead line systems, cables and network power supply
- Earthing and return current circuitry concept design
- Protection, to limit short circuit currents, supervision of procurement and commissioning of rate-of-rise limiting inductors at the Frutigen substation
- Investigation of network stability
- Non-ionising radiation and other test measurements to validate the design